{"id":3711,"date":"2019-08-22T10:55:41","date_gmt":"2019-08-22T10:55:41","guid":{"rendered":"http:\/\/www.ndac.co.uk\/blog\/?p=3711"},"modified":"2019-11-06T10:26:10","modified_gmt":"2019-11-06T10:26:10","slug":"infrastructure-works-slipway-improvements","status":"publish","type":"post","link":"https:\/\/ndac.co.uk\/blog\/2019\/08\/infrastructure-works-slipway-improvements\/","title":{"rendered":"Infrastructure Works &#038; Slipway Improvements"},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ndac.co.uk\/news\/images_news\/2019\/2019-08_infrastructureworks\/IMG_6914_650.jpg\" width=\"650\" height=\"390\" alt=\"Infrastructure works at the National Diving &amp; Activity Centre\" \/><\/p>\n<p>We have been carrying out some infrastructure works at the National Diving &amp; Activity Centre.<\/p>\n<p>Twenty tonnes of concrete has been laid to extend the lake&#8217;s slipway and improve access to and from the water.<\/p>\n<p>We request that visitors keep out of the coned areas until the concrete has dried fully.<\/p>\n<p>We hope this improvement will help our divers access and egress the water a little more easily. Watch this space for further improvements.<\/p>\n<p>\n  <!--more--><br \/>\n  <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ndac.co.uk\/news\/images_news\/2019\/2019-08_infrastructureworks\/infrastructure_650.jpg\" width=\"650\" height=\"325\" alt=\"Infrastructure works at the National Diving &amp; Activity Centre\" \/><br \/>\n  <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ndac.co.uk\/news\/images_news\/2019\/2019-08_infrastructureworks\/IMG_6928_650.jpg\" alt=\"Infrastructure works at the National Diving &amp; Activity Centre\" width=\"650\" height=\"390\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have been carrying out some infrastructure works at the National Diving &#038; Activity Centre.<\/p>\n<p>Twenty tonnes of concrete has been laid to extend the lake&#8217;s slipway and improve access to and from the water.<\/p>\n<p>We request that visitors keep out of the coned areas until the concrete has dried fully.<\/p>\n<p>We hope this improvement will help our divers access and egress the water a little more easily. Watch this space for further improvements.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1767,1766,2623],"tags":[1758,1708,1898,1874],"_links":{"self":[{"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/posts\/3711"}],"collection":[{"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=3711"}],"version-history":[{"count":2,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/posts\/3711\/revisions"}],"predecessor-version":[{"id":3777,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/posts\/3711\/revisions\/3777"}],"wp:attachment":[{"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=3711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=3711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndac.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=3711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}